CLIENT Camperio condominium administration       
TITLE Redevelopment of the air conditioning system
BUILDING Residential complex via Camperio via Giulini - Milan
Timeframe of service execution 2022
ROLE in the service execution M&E design, civil structural, works management, construction site safety, testing and commissioning

PURPOSE OF SERVICE

Design of mechanical, electrical and civil/structural plant systems, works management, testing and commissioning, site safety coordination, as part of plant requalification works for the purposes of plant energy efficiency and not the mere replacement of existing plants with equivalent systems, in order to optimize consumption (including winter) and to access the incentive systems implemented by the Italian state.

HIGHLIGHTS

The building is located in Via Manfredo Camperio, on the corner of Via Giorgio Giulini in the historic center of Milan. The complex is made up of four distinct blocks, which arose in different historical periods.

The plant design paid particular attention to the principles of sustainability, functionality and above all energy saving, replacing the existing systems, which were old and had bacterial proliferation phenomena (refrigeration plant and evaporative tower) or which performed poorly energetically (methane boilers) or which were functionally ineffective. (UTA and accounting), with new generation machines and equipment, aimed at energy saving, environmental protection and functional efficiency, making the intervention fall within the incentive mechanisms.

 

in collaboration with the ARCHITECT
@Donatella WallnöferBIOARCHITECTURE expert

Find out more

For more information on this project you can contact us directly to our email info@ncaeng.it

en_GBEnglish (UK)