CLIENT FERRIERE NORD S.p.A.
TITLE NEW CONSTRUCTION
System design and safety: NCA Engineering S.r.L.
BUILDING New 2,400 m2 service building - Via delle Ferriere, Osoppo (UD), Italy
Timeframe of service execution 2018
ROLE in the service execution Design of electrical and mechanical systems (preliminary, development and technical building plan, specialised work supervision and testing

PURPOSE OF SERVICE

Plant design for the construction of a new two-floor service building for production offices, staff changing rooms and company canteen inside the iron-and-steel plant complex of FERRIERE NORD S.p.A. located at Via delle Ferriere in Osoppo (UD), Italy.

HIGHLIGHTS

Systems were expected to fulfil the following basic principles and guidelines:

  • Energy efficiency of all planned systems and components, in full compliance with all standards, laws and regulations.
  • Flexibility in the use of systems according to the different areas in the building.
  • Heat recovery on installed systems.
  • Use of renewable energy sources compliant with relevant regulations.
  • Maximum effectiveness and attention to comfort and environmental well-being via the control of thermo-hygrometric and air quality parameters.
  • Control, adjustment and supervision of systems to provide maximum comfort, energy saving and flexibility of use.
  • Maximum attention to maintenance aspects aimed at optimising and streamlining maintenance operations.

Our partners

PALOMA ARCHITECTS

Find out more

For more information on this project you can download the pdf or contact us directly.

en_GBEnglish (UK)