CLIENT | From TELE+ to SKY |
TITLE | Contact center Sky Cagliari |
BUILDING | Sestu (CA) |
Timeframe of service execution | 2000-2010 |
ROLE in the service execution | M&E design, data/voice, special, fire prevention, works management, construction site safety, testing and commissioning |
PURPOSE OF SERVICE
Design of mechanical and electrical plant systems, plant management, testing and commissioning, site safety coordination, as part of the plant works for the construction of the new contact center of TELE+ (national pay TV leader in 2000 ) and subsequently (in 2007) for the complete restructuring of the plant structure for the incoming SKY, with the replacement of existing plants with more efficient and functional systems in order to optimize consumption and guarantee a higher degree of reliability.
HIGHLIGHTS
The complex located in the municipality of Sestu (CA) was created from the complete renovation, civil-architectural and plant engineering, of an industrial warehouse, adapted to an open space with an original architectural concept, unique in its kind, supported by a plant engineering project resulting challenging, due to the particularity of the functional and architectural needs to be satisfied. The subsequent restructuring with expansion of the plant structure, made necessary by the changed needs of the new tenant (SKY), was particularly challenging due to the need to keep the contact center operational as much as possible, reducing the switch-off phases to a minimum and keeping the old system until the changeover to the new structure achieved in a very short time.
Find out more
For more information on this project you can contact us directly to our email info@ncaeng.it